Projects
45 Head Cattle Yard
August 2023
The brief:
Design and install a new set of cattle yards to replace old wooden yards that were removed when building the Otaki to Peka Peka Expressway.
Yards must hold 30 head, have 2 pens, 3 way drafting, a headbail and drenching race with catwalk. Installation on new metal pad.
Timeframe:
6 Weeks from confirmation of design to completion.
The final result:
45 Head Cattle Yard
January 2023
The brief:
Design and install a new set of cattle yards to replace old wooden yards.
Yards must hold one truck load of animals, have 2 pens, 3 way drafting, a headbail and drenching race with catwalk. Forcing pen and drenching race to have a concrete floor. New metaled entrance way and gates to be installed.
Timeframe:
1 month from confirmation of design to completion.
Design:
3D CAD drawings created.
Progress:
Our team finishing off the concrete pad.
The final result:
20 Head Cattle Yard
January 2025
The brief:
Install a yard to comfortably manage around 20 head, with a crush and head bail for safe handling, plus the ability to load stock straight from the property.
The client chose the LSP-20 Lifestyle Yard with our Multihandler crush – the perfect balance of features without going overboard.
With solid fencing, reliable gates, and a smart layout, moving cattle in and out is now easy, safe, and stress-free."
Timeframe:
2 weeks from confirmation of order to completion.